Ras Tanura Industrial Wastewater Treatment Project (IWWTP)

Ras Tanura Industrial Wastewater Treatment Project (IWWTP) is currently under construction and was procured on a PPP basis  by Saudi Aramco (Offtaker).

Future Water and Power Consulting (FWPC) has successfully advised the consortium of Miahona and Thabat during the bidding phase and is providing the design review and construction supervision services on the project.

Saudi Aramco’s complex at Ras Tanura is one of the world’s largest crude oil terminals, with a refining capacity of 550,000 barrels a day (b/d).